Cozy Serenity
  • Home
  • Build Chapters
    • Chapter 3: Education
    • Chapter 4: Bulkheads
    • Chapter 5: Sides
    • Chapter 6: Fuselage Assembly
    • Chapter 7: Fuselage Exterior
    • Chapter 8: Headrests And Seat Belts
    • Chapter 9: Landing Gear And Brake >
      • Chapter 9a: Main Gear
      • Chapter 9b: Landing Brake
      • Chapter 9C: Landing Gear Cover And Leg Fairings
      • Chapter 9D: Axle and Wheel Install
    • Chapter 10: Canard Wing
    • Chapter 11: Elevators
    • Chapter 12: Canard Installation
    • Chapter 16: Control System
    • Chapter 24: Covers And Fairings
  • Info, Tips, Tricks, And Modifications
    • Info For New Builders
    • Metal Working For Plastic Plane People
    • Abbreviation And Term List
    • Cozy Part Name Reference
    • Fiberglass Defects
    • Tips And Tricks
    • Projects Page >
      • DIY Cupless Aviation Headset
      • Lightsabers
      • Striplin F.L.A.C Ultralight
      • Cozy Mk IV for Sale
    • Tools And Shop Setup
    • Resources
    • Flight Training
  • About The Cozy
  • The Crazy Canard
  • Links
  • Images
  • Videos
  • Fly-Ins and Events
    • Rutan Type Fly-in 2013
    • Great Rocky Mountain Canard Rendezvous 2014
    • Rutan Type Fly-in 2014
    • Rutan Type Fly-in 2016
    • Rutan Type Fly-in 2017
    • Rutan Type Fly-in 2018

Cozy Mark IV Build Chapters

Picture
As each chapter is started, information about the build process for that step will be posted along with any tips or troubleshooting that is found along the way.  At the completion of the chapter, I'll post the times and weights of each parts (where they're able to be measured).


Chick on a chapter listing to go to that chapter or use the Build Chapter at the top.  


Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7

Chapter 8
Chapter 9
Chapter 10

Chapter 11
Chapter 12
Chapter 16
Chapter 24

Build Instructions, Shop Setup, and Confidence Pieces
Bulkheads (Seatback, IP, F22, F28, Front and Back Landing Gear)
Construction of the fuselage sides
Assembly of the sides and bulkheads, adding the bottom to the fuselage
Fuselage exterior finishing
Headrests and seatbelts
Landing Gear and Landing Brake
​Canard Wing Fabrication (Rebuild half way through)
Elevator Fabrication and Installation
Canard Installation
Control System
Covers And Fairings

Time: Ongoing, never-ending
Time: 92 hours
Time: 99 hours
Time: 169 hours
Time: 94 hours
Time: 56 hours
Time: 340 hours
Time: 262 hours
Time: 80 hours
Time: 51 hours
Time: In progress
Time: In progress

Powered by Create your own unique website with customizable templates.